How Many Bricks for a 10×10 Patio?

Updated November 2026

A 10×10 patio is the most common backyard project size, and the brick count is where most people go wrong: they count the patio, then forget the extra bricks for cuts. Here is the exact count for standard 4×8 inch patio pavers, worked out the same way the Paver Calculator works it out, plus the base and sand amounts the patio needs underneath.

Quick Answer

A 10×10 patio (100 sq ft) needs 450 pavers exactly, using standard 4×8 inch pavers laid flat. Order 495 pavers to cover the standard 10% extra for cuts and breakage on a straight running bond pattern.

Your patio is a different size or pattern? The Paver Calculator works out the count for any patio, with the right extra for herringbone and curved edges too.

The Math, Step by Step

Step 1: Find the patio area. 10 ft × 10 ft = 100 sq ft.

Step 2: Find how many pavers fit in one square foot. One 4×8 inch paver covers 4 × 8 = 32 square inches. One square foot is 144 square inches, so 144 ÷ 32 = 4.5 pavers per sq ft. Sand-set pavers sit almost touching, so no joint space is subtracted.

Step 3: Multiply. 100 sq ft × 4.5 = 450 pavers exactly.

Step 4: Add extra for cuts. Edge pavers have to be cut to fit, and a few always break. Add 10% for a straight pattern: 450 × 1.10 = 495 pavers to order.

Setting them in mortar instead? If the bricks are laid in mortar with 3/8 inch joints, each brick takes up more room (about 36.6 sq in), so the count drops to about 393 bricks, and about 433 with 10% extra. Most backyard patios are sand-set, and every number below uses the sand-set count.

Brick Counts for Common Patio Sizes

All counts use standard 4×8 inch pavers (4.5 per sq ft), laid flat, sand-set.

Patio SizeAreaExact PaversTo Order (10% extra)
8×8 ft64 sq ft288317
10×10 ft100 sq ft450495
10×12 ft120 sq ft540594
12×12 ft144 sq ft648713
12×16 ft192 sq ft864951
16×16 ft256 sq ft1,1521,268
20×20 ft400 sq ft1,8001,980
A 10 × 10 Patio in Running Bond 10 ft · 15 pavers along each row 30 rows × 15 pavers = 450 pavers exactly · each row starts half a brick over

Running bond: every row is offset by half a brick, which is what makes the pattern strong and easy to lay.

Extra Bricks by Pattern

The pattern changes how many cuts you make, so it changes the extra you should add. Counts below are for this 10×10 patio (450 exact).

PatternExtra to AddBricks to Order
Stacked bond5%473
Running bond10%495
Basket weave10%495
Herringbone (45° or 90°)15%518
Curved edges or a circle20%540

Herringbone looks the most decorative but needs the most cuts along every edge. Running bond is the easiest pattern for a first patio.

What Else You Need for a 10×10 Patio

Gravel base: a 4 inch compacted gravel base under this patio is about 1.23 cubic yards of gravel. Order about 1.5 cubic yards to cover compaction and spillage. The Gravel Calculator works out other sizes and depths.

Bedding sand: a 1 inch layer of coarse sand over the base is about 0.31 cubic yards.

Edge restraints: the patio perimeter is 10 + 10 + 10 + 10 = 40 linear feet of plastic or metal edging, plus spikes.

Polymeric sand: for sweeping into the joints, plan on about 3 bags (50 lb) for this patio at a cautious coverage of 40 sq ft per bag. Check your bag’s label before you buy: coverage changes a lot with joint width, and some bags cover much more.

Slope: build the base with a slight slope away from the house, about 1/8 to 1/4 inch of fall per foot, so rain runs off instead of pooling.

How Much Do the Bricks Cost?

Standard 4×8 concrete pavers are example-priced at about $0.50 to $1.50 each. For the 495 bricks this patio needs, that is about $250 to $740 for the bricks alone. Clay pavers cost more, and the gravel base, sand and edging are on top of this.

These are example prices only. Prices change by area, supplier and type.

Mistakes to Avoid

Ordering the exact count. 450 is the exact fit with no cuts. Edge bricks always need cutting and a few break, so order 495 for a straight pattern, more for herringbone or curves.

Ordering in separate batches. Buy all the bricks in one order. Color varies slightly between production runs, and a second batch can visibly mismatch the first.

Skipping the gravel base. Pavers laid straight on soil shift and sink within a year. The 4 inch compacted base is what keeps the patio flat.

Using wall bricks on the ground. Regular wall bricks are softer and can crack in freeze and thaw weather. Use pavers made and rated for patios and walkways.

Forgetting the slope. A dead-flat patio holds puddles. A small fall away from the house keeps it dry.

Your Patio Is Different?

🧮 Use the Paver Calculator: Type any patio size, pick a pattern, and get the paver count, gravel base and sand amounts in seconds.

Planning a brick wall instead of a patio? That is a different count: the Brick Calculator works out bricks and mortar for walls.

Questions People Ask

How many bricks do I need for a 10×10 patio?

450 pavers exactly with standard 4×8 inch pavers, and 495 to order once you add the standard 10% extra for cuts and breakage.

How many 4×8 pavers are in a square foot?

4.5 pavers per square foot. One paver covers 32 square inches, and a square foot is 144 square inches, so 144 ÷ 32 = 4.5.

How much extra should I add for cuts?

Add 10% for straight patterns like running bond, 15% for herringbone, and 20% if the patio has curved edges. The more cuts, the more extra you need.

How much do pavers cost for a 10×10 patio?

At example prices of $0.50 to $1.50 per paver, the 495 pavers cost about $250 to $740. The gravel base, sand and edging are extra. These are example prices only. Prices change by area, supplier and type.

What goes under patio pavers?

About 4 inches of compacted gravel, then 1 inch of coarse bedding sand. The pavers sit on the sand, and polymeric sand is swept into the joints to lock them.

More Example Guides

Please note: Results are estimates. Patio shape, pattern, and brick size affect the final count. Confirm with your supplier before ordering.

Planning a bigger job for a customer? Our free Estimate Maker turns your numbers into a clean estimate.